国产精品亚洲自在线播放页码|97人妻无码精品免费碰碰|日本一区二区三区精品国产|站色视频免费茄子视频

Hengshui Youjiete New Material Technology Co., Ltd.

Hengshui YOUJIETE New Material Technology Co., Ltd.Composite Material Complete Set Product for Gas Station

Hotline:0086-0318-8625288Language: Colse EnglishEnglish 中文中文

Old oil tank installation finished manhole well solution

Author:admin Source:www.www.organicgarden101.com time:2019-12-24 browse:  

    In recent years, during the reconstruction of the gas station, the problem of installing finished manhole Wells in old oil tanks was encountered. The composite manhole well flange developed by Youjet company provides a solution for installing finished manhole Wells in old oil tanks. The product is shown as follows:


image.png


Figure 1 composite manhole well flange base


Ⅰ. product features:

    Youjiete composite water stop plate flange (Strengthened inward-flanged manhole well (1400)) is made of high strength SMC single-die molding, which has the following advantages:

1. Good size consistency, no deformation and good interchangeability;

2. SMC molding once molding high strength, beautiful appearance;

3. Good product stability, high degree of automation and easy mass production;

4. Good matching with oil tank and easy construction of multiple baselines;

5. Installation operation can be carried out for oil tanks of different diameters.

Ⅱ. Product size:

Overall size: Φ1500X443mm

Net weight: 42kg

Ⅲ. Product installation instructions:

1. Lift the flange of composite water stop plate (hereinafter referred to as flange) to the manhole position of the oil tank, align the marking, remove the flange, and polish 150mm inside and outside the marking area with the grinding wheel of Angle grinder louver, then polish the metal oil tank to produce new metal, and then polish the surface of the glass fiber reinforced plastic oil tank.The following schematic diagram and on-site operation photos:


image.png



Figure 2 diagram of grinding area


image.png


2. Polish the inner and outer areas of the flange with a height of 100mm into pitted surfaces, and polish all the pitted surfaces in the bonding areas as shown below:


image.png



Figure 4 shows the gray and white areas


3. Lift the flange onto the oil tank and install the flange with butt datum line and direction arrow aligned with the oil tank axis, as shown below:


image.png


Figure 5 installation diagram


4. Wipe the adhesive area with a clean cloth or blow the dust with an air gun, and seal the seam with adhesive sealant.


image.png


Figure 6 caulking diagram


5. When the adhesive sealant is solidified, if the flange is bonded to SF steel wall, special resin for iron bonding and glass fiber felt are needed, and the bonding layer is strengthened with the same resin and glass fiber felt as the outer wall of the oil tank, please see the following figure:



image.png


Figure 7 construction bonding diagram


6. After the resin is completely solidified, the flange bonding can be completed. Please see the following figure:

image.png


Figure 8 finished effect


image.png


Figure 9 site construction drawing


image.png


Figure 10 manhole diagram of finished installation


image.png


Figure 11 site installation photos

Last:The construction record of 18 preferred engineering teams of Youjiete
Next:Eliminate "one-size-fits-all", emissions standards do not need to stop production limit
News Center

Contact Us

Hotline:0086-0318-8625288

Fax:0086-0318-8625288

Email:

Skype:

Add.:No. 589, Chang’an east road, Jizhou district, Hengshui city, Hebei province,China

东乡族自治县| 南平市| 定陶县| 兴海县| 昌江| 昌吉市| 砚山县| 资中县| 唐山市| 江达县| 梨树县| 浦县| 石景山区| 东安县| 库尔勒市| 阿拉尔市| 呼伦贝尔市| 天柱县| 日喀则市| 比如县| 潼关县| 衡阳县| 华容县| 利川市| 海宁市| 太谷县| 叶城县| 菏泽市| 汉源县| 遵化市| 临朐县| 唐海县| 武义县| 辽阳市| 雅安市| 武山县| 兴义市| 探索| 神农架林区| 宜兴市| 深圳市|